Is the build sequenced to prove readiness, or just to finish installation?
Rate each critical system and the commissioning process from 0 (absent) to 4 (embedded and verified). Facility readiness is gated by the weakest critical system, not the average: you cannot turn over a hall whose power or cooling is unproven. Installed-quality discipline is the separate Quality Scorecard.
Critical systems iReadiness is limited by the least-ready critical system (a bottleneck), not the average. One unproven system caps the whole facility.
Commissioning process
Commissioning readiness
Installation Complete, Cx Lagging
Equipment is going in, but commissioning is trailing the schedule. Readiness depends on catch-up that energization pressure rarely allows.
System & process readiness
30-day readiness actions
Foundations
The disciplines, levels, and gates in this index draw on established commissioning practice:
- ASHRAE Guideline 0 — The Commissioning Process
- Building Commissioning Association (BCxA) — Best Practices in Building Commissioning
- Data center commissioning levels — Level 1 factory witness through Level 5 integrated systems test
- NETA Acceptance Testing Specifications (ATS) — electrical system acceptance
- Uptime Institute Tier Standard — commissioning toward Tier certification
Index for planning discussion only. It does not replace the project commissioning plan, contract requirements, equipment manufacturer procedures, or authority having jurisdiction requirements.